| 21. |
What does the below given symbol represent when we construct a flow chart?
|
||||||||
|
Answer:
Option (d) |
| 22. |
What does the below given symbol represent when we construct a flow chart?
|
||||||||
|
Answer:
Option (d) |
| 23. |
Process deployment flow is another term for ________
|
||||||||
|
Answer:
Option (a) |
| 24. |
Tally sheet is another term for _______
|
||||||||
|
Answer:
Option (d) |
| 25. |
The type of checksheet used to collect information on process variability is called ________
|
||||||||
|
Answer:
Option (a) |
| 26. |
The type of check sheet which specifies the variety of defects with their frequency of occurrence is called _________
|
||||||||
|
Answer:
Option (b) |
| 27. |
The type of check sheet which identifies where defects occur in a product is called _______
|
||||||||
|
Answer:
Option (c) |
| 28. |
The type of check sheet used to monitor the input parameters that can affect the occurrence of defects in a process is called _________
|
||||||||
|
Answer:
Option (d) |
| 29. |
In which country was 5S invented?
|
||||||||
|
Answer:
Option (b) |
| 30. |
What is the English equivalent of the Japanese word ‘Seiri’?
|
||||||||
|
Answer:
Option (a) |