51. |
Which of the following is not part of the ‘Measure’ activity in the DMAIC Model of Six Sigma?
|
||||||||
Answer:
Option (c) |
52. |
Which of the following is not a tool used in the ‘Analyze’ process in the DMAIC Model of Six Sigma?
|
||||||||
Answer:
Option (a) |
53. |
Which of the following is not part of the ‘Improve’ activity in the DMAIC Model of Six Sigma?
|
||||||||
Answer:
Option (d) |
54. |
Which of the following is not a tool used in the ‘Improve’ process in the DMAIC Model of Six Sigma?
|
||||||||
Answer:
Option (c) |
55. |
What does the letter ‘D’ and ‘V’ refer to in the DMADV model?
|
||||||||
Answer:
Option (d) |
56. |
The Six Sigma model used for improving the existing process/product is ______
|
||||||||
Answer:
Option (a) |
57. |
What is meaning of “Kaizen” ?
|
||||||||
Answer:
Option (a) |
58. |
What is meaning of “KAI” in Kaizen ?
|
||||||||
Answer:
Option (a) |
59. |
What is meaning of “Zen” in Kaizen ?
|
||||||||
Answer:
Option (b) |
60. |
One of the main objectives of Kaizen is “making the improvement through elimination of _________?
|
||||||||
Answer:
Option (b) |