| 51. |
Which of the following is not part of the ‘Measure’ activity in the DMAIC Model of Six Sigma?
|
||||||||
|
Answer:
Option (c) |
| 52. |
Which of the following is not a tool used in the ‘Analyze’ process in the DMAIC Model of Six Sigma?
|
||||||||
|
Answer:
Option (a) |
| 53. |
Which of the following is not part of the ‘Improve’ activity in the DMAIC Model of Six Sigma?
|
||||||||
|
Answer:
Option (d) |
| 54. |
Which of the following is not a tool used in the ‘Improve’ process in the DMAIC Model of Six Sigma?
|
||||||||
|
Answer:
Option (c) |
| 55. |
What does the letter ‘D’ and ‘V’ refer to in the DMADV model?
|
||||||||
|
Answer:
Option (d) |
| 56. |
The Six Sigma model used for improving the existing process/product is ______
|
||||||||
|
Answer:
Option (a) |
| 57. |
What is meaning of “Kaizen” ?
|
||||||||
|
Answer:
Option (a) |
| 58. |
What is meaning of “KAI” in Kaizen ?
|
||||||||
|
Answer:
Option (a) |
| 59. |
What is meaning of “Zen” in Kaizen ?
|
||||||||
|
Answer:
Option (b) |
| 60. |
One of the main objectives of Kaizen is “making the improvement through elimination of _________?
|
||||||||
|
Answer:
Option (b) |