| 11. |
Which tool is used to analyse the effects of a failure of individual components on the system?
|
||||||||
|
Answer:
Option (b) |
| 12. |
What is arrow diagram in TQM?
|
||||||||
|
Answer:
Option (a) |
| 13. |
The frequency distribution of a numerical data can be graphically represented by a ______
|
||||||||
|
Answer:
Option (a) |
| 14. |
Which of the following type of histogram represents a normal distribution?
|
||||||||
|
Answer:
Option (a) |
| 15. |
Pareto diagram is named after ________
|
||||||||
|
Answer:
Option (a) |
| 16. |
Which of the following tool can be used as a risk assessment technique from activity level to system level?
|
||||||||
|
Answer:
Option (a) |
| 17. |
Pareto analysis is also known by _______
|
||||||||
|
Answer:
Option (a) |
| 18. |
What does the below given symbol represent when we construct a flow chart?
|
||||||||
|
Answer:
Option (a) |
| 19. |
What does the below given symbol represent when we construct a flow chart?
|
||||||||
|
Answer:
Option (b) |
| 20. |
What does the below given symbol represent when we construct a flow chart?
|
||||||||
|
Answer:
Option (c) |