Quality Engineering (2181920) MCQs

MCQs of Contemporary Trends in Quality Engineering & Management

Showing 1 to 10 out of 101 Questions
1.

Which of the following is not related to JIT implementation?

(a)

Pull System

(b)

Push System

(c)

Zero inventory

(d)

Zero lead time

Answer:

Option (b)

2.

MRP is a ____ system and JIT is a _____ system.

(a)

pull, pull

(b)

push, push

(c)

push, pull

(d)

pull, push

Answer:

Option (c)

3.

Which of the following are not the results of the successful implementation of JIT?

(a)

Improved quality

(b)

Sporadic improvement of productivity

(c)

Elimination of waste

(d)

Reduction in cost of operations

Answer:

Option (b)

4.

According to conventional approach, inventory is ______ and according to JIT, inventory is ______.

(a)

necessary, unnecessary

(b)

unnecessary, necessary

(c)

necessary, necessary

(d)

unnecessary, unnecessary

Answer:

Option (a)

5.

 Which of the following is not a principle of JIT manufacturing?

(a)

Total Quality Management

(b)

Production Management

(c)

MRP

(d)

Supplier Management

Answer:

Option (c)

6.

Which of the following is not a benefit of JIT?

(a)

Reduction in throughput time

(b)

Improvement in quality

(c)

Improvement in productivity

(d)

High reliance on suppliers

Answer:

Option (d)

7.

Which of the following is not a disadvantage of JIT?

(a)

The danger of lost sales

(b)

The danger of disrupted production

(c)

Less time for quality control

(d)

 Greater flexibility

Answer:

Option (d)

8.

Which of the following is not a benefit of JIT?

(a)

Better utilization of personnel

(b)

Reduced space requirements

(c)

High transaction costs

(d)

Reduced inventory

Answer:

Option (c)

9.

Which of the following means ‘visual cards’?

(a)

Poka-yoke

(b)

5S

(c)

Muda

(d)

Kanban

Answer:

Option (d)

10.

C-Kanban is also known as _______.

(a)

P- Kanban

(b)

Production Kanban

(c)

Withdrawal Kanban

(d)

Poka-Yoke

Answer:

Option (c)

Showing 1 to 10 out of 101 Questions