Quality Engineering (2181920) MCQs

MCQs of Contemporary Trends in Quality Engineering & Management

Showing 51 to 60 out of 101 Questions
51.

In which of the following stages of TPM is the announcement to the top management about the decision to introduce TPM made?

(a)

Preliminary implementation stage

(b)

TPM implementation stage

(c)

Stabilization stage

(d)

Preparation stage

Answer:

Option (d)

52.

Which of the following is a technique to educate everyone in the organization starting from managers to general workers about TPM?

(a)

Seminars only

(b)

Slide presentations only

(c)

Seminars, slide presentations, retreats

(d)

Retreats only

Answer:

Option (c)

53.

Which of the following must not be focused on when formulating TPM policies and goals?

(a)

Result-oriented

(b)

Attainable

(c)

Measurable

(d)

Unrealistic

Answer:

Option (d)

54.

Which of the following is not a part of holding the TPM kick-off?

(a)

Announcing to top management about the decision to introduce TPM

(b)

Invite client companies

(c)

Invite affiliated companies

(d)

Invite subcontracting companies

Answer:

Option (a)

55.

In which stage in TPM development is the step to improve the effectiveness of each piece of equipment taken?

(a)

Preparation stage

(b)

Preliminary inspection stage

(c)

TPM implementation stage

(d)

Stabilization stage

Answer:

Option (c)

56.

In which stage of TPM development the focus is to set higher TPM goals?

(a)

Preparation stage

(b)

Preliminary inspection stage

(c)

TPM implementation stage

(d)

Stabilization stage

Answer:

Option (d)

57.

In which stage of TPM development is the development of the early equipment management program carried out?

(a)

TPM implementation stage

(b)

Preliminary inspection stage

(c)

Preparation stage

(d)

Stabilization stage

Answer:

Option (a)

58.

In which stage of TPM development a scheduled maintenance program for the maintenance department developed?

(a)

Stabilization stage

(b)

Preliminary inspection stage

(c)

Preparation stage

(d)

TPM implementation stage

Answer:

Option (d)

59.

If availability is 85%, performance efficiency is 50%, and the rate of quality products is 98%, then find out the overall equipment effectiveness?

(a)

41.65%

(b)

42.65%

(c)

43.65%

(d)

44.65%

Answer:

Option (a)

60.

What is the quality score if an asset produces 15000 units out of which 500 are defective?

(a)

92.67%

(b)

94.67%

(c)

96.67%

(d)

98.67%

Answer:

Option (c)

Showing 51 to 60 out of 101 Questions