Quality Engineering (2181920) MCQs

MCQs of Contemporary Trends in Quality Engineering & Management

Showing 91 to 100 out of 101 Questions
91.

Which of the following is not a six sigma belt level ranking?

(a)

Yellow Belt

(b)

Pink Belt

(c)

Green Belt

(d)

Black Belt

Answer:

Option (b)

92.

Which of the following is not part of the ‘Define’ activity in the DMAIC Model of Six Sigma?

(a)

Identification of project

(b)

Identification of champion

(c)

Identification of project owner

(d)

Identification of founder of the business

Answer:

Option (d)

93.

Which of the following does not belong to the ‘Define’ activity in the DMAIC Model of Six Sigma?

(a)

Determination of customer requirements

(b)

Determination of CTQs

(c)

Validating the measurements

(d)

Mapping the process

Answer:

Option (c)

94.

Which of the following is not a tool used in the ‘Define’ process in the DMAIC Model of Six Sigma?

(a)

Project charter and plan

(b)

Check sheet

(c)

Effort/impact analysis

(d)

Process mapping

Answer:

Option (b)

95.

Which of the following is not a tool used in the ‘Measure’ process in the DMAIC Model of Six Sigma?

(a)

Quality Function Deployment

(b)

Measurement Systems Analysis

(c)

Process capability

(d)

Tree diagram

Answer:

Option (d)

96.

Which of the following is not part of the ‘Measure’ activity in the DMAIC Model of Six Sigma?

(a)

Determining operational definitions

(b)

Establishing performance standards

(c)

Developing the project plan

(d)

Developing data collection and sample plan

Answer:

Option (c)

97.

Which of the following is not a tool used in the ‘Analyze’ process in the DMAIC Model of Six Sigma?

(a)

Quality Function Deployment

(b)

Histogram

(c)

Pareto Diagram

(d)

V

Answer:

Option (a)

98.

Which of the following is not part of the ‘Improve’ activity in the DMAIC Model of Six Sigma?

(a)

Determination of solution effectiveness using data

(b)

Implementing solution

(c)

Developing solution alternatives

(d)

Closing project and communicating results

Answer:

Option (d)

99.

Which of the following is not a tool used in the ‘Improve’ process in the DMAIC Model of Six Sigma?

(a)

Design of Experiments

(b)

Brainstorming

(c)

Statistical Process Control

(d)

Failure Mode Effect Analysis

Answer:

Option (c)

100.

OCAP refers to ________.

(a)

On Control Action Plan

(b)

Out of Control Action Plan

(c)

Out of Concern Action Plan

(d)

Out of Control Assessment Plan

Answer:

Option (b)

Showing 91 to 100 out of 101 Questions