11.
Secure dispatch is the state of power system where
(a) Contingency outage is always present
(b) Contingency outage is not present
(c) Security is not present
(d) All of above
Answer:

Option (b)

12.
Secure post contingency is the state of the
(a) Power system when contingency analysis is applied to the base operating condition with correction
(b) Power system when contingency analysis is applied to the base operating condition with without correction
(c) Power system when contingency analysis is not applied to the base operating condition
(d) None of above
Answer:

Option (a)

13.
The possible way to study thousand of possible outages is
(a) Load flow
(b) State estimation
(c) Linear sensitivity factor
(d) None of above
Answer:

Option (c)

14.
Generation shift sensitivity factor is determined by [Where ‘i’ corresponds to bus in which the generator is connected, ‘l’ corresponds to the line under study, i.e. between the buses n and m, X l is the reactance of the line, X niand X mi all the corresponding values in the sensitivity matrix]
(a) ali=1XlXni-Xmi
(b) ali=1XlXni+Xmi
(c) ali=1XlXni+2Xmi
(d) Not possible to determine
Answer:

Option (a)

15.
Line outage distribution factor is determined by [Where ‘l’ corresponds to the line under study, i.e. between the buses ‘n’ and ‘m’ and ‘k’ corresponds to the outage of the line which is connected between buses ‘i’ and ‘j’]
(a) dl,k=xkxlxin-xjn+xim+xjmxk-xii+xjj-2 xij
(b) dl,k=xkxlxin-xjn-xim+xjmxk-xii+xjj+2 xij
(c) dl,k=xkxlxin-xjn-xim+xjmxk-xii+xjj-2 xij
(d) Any of above
Answer:

Option (c)

16.
System Black out means
(a) All power systems collapse
(b) The entire system or larger part of power system may collapse
(c) A small part of power system is collapse
(d) None of above
Answer:

Option (b)

17.
Which of this power plant is started first after system black out
(a) Thermal
(b) Nuclear
(c) Hydro
(d) All of above
Answer:

Option (c)

18.
National Load Dispatch Center is run by
(a) Power Grid Corporation of India Limited (PGCIL)
(b) Power System Operation Corporation Limited (POSOCO)
(c) Government of India
(d) Government of Delhi
Answer:

Option (b)

19.
National Load Dispatch Center is situated at
(a) New Delhi
(b) Mumbai
(c) Kolkata
(d) None of above
Answer:

Option (a)

20.
How many regional load dispatch centers are available in India?
(a) 4
(b) 5
(c) 8
(d) 10
Answer:

Option (b)