1. |
______________ was the First twenty-year road development plan.
|
||||||||
Answer:
Option (a) |
2. |
_____________was the Second twenty-year road development plan.
|
||||||||
Answer:
Option (b) |
3. |
______________ was the Third twenty-year road development plan.
|
||||||||
Answer:
Option (c) |
4. |
In which road development plan, the roads are classified as NH, SH, MDR, ODR & VR ?
|
||||||||
Answer:
Option (a) |
5. |
In which road development plan, the roads are classified as Primary, Secondary and tertiary system
|
||||||||
Answer:
Option (c) |
6. |
A target road density per 100 sq. km. in Nagpur Road Plan is ___________.
|
||||||||
Answer:
Option (b) |
7. |
A target road density per 100 sq. km in Bombay Road Plan is ___________.
|
||||||||
Answer:
Option (c) |
8. |
A target road density per 100 sq. km in Lucknow Road Plan is ___________.
|
||||||||
Answer:
Option (a) |
9. |
The basic requirement of alignment should be
|
||||||||
Answer:
Option (d) |
10. |
Obligatory points through which the alignment should not pass are
|
||||||||
Answer:
Option (a) |