81. |
The minimum diameter of the stirrups bar is provided in the beam more than 5m long.
|
||||||||
Answer:
Option (b) |
82. |
Stirrups in RC beam provided to resist ______________
|
||||||||
Answer:
Option (d) |
83. |
________ Minimum numbers of bars are provided throughout in beam top and bottom as per Indian standard
|
||||||||
Answer:
Option (a) |
84. |
For Ductile Detailing required in structure is located in seismic zone III and is more than ________ Storey High.
|
||||||||
Answer:
Option (c) |
85. |
_____________ Failure is occurred in the beam due to less steel provided on tension face.
|
||||||||
Answer:
Option (a) |
86. |
In Which earthquake zone Ductile Detailing required?
|
||||||||
Answer:
Option (d) |
87. |
Which seismic code states the Indian standard guidelines for ductile detailing of RC structure subjected to Earthquake Forces?
|
||||||||
Answer:
Option (a) |
88. |
Which seismic code states the Indian standard guidelines for ductile detailing of RC structure subjected to Earthquake Forces?
|
||||||||
Answer:
Option (a) |
89. |
Which is a good example of how the ground acts during liquefaction?
|
||||||||
Answer:
Option (a) |
90. |
During an earthquake, soil and water can combine to form a semi-solid material in a process called __________.
|
||||||||
Answer:
Option (c) |