Construction Management (2180611) MCQs

MCQs of Construction quality management

Showing 21 to 30 out of 33 Questions
21.
Quality conformance indicates ________.
(a) Consistency in delivering the designed product
(b) Performance of end product
(c) Value of service rendered with product
(d) All of the above
Answer:

Option (a)

22.
TQM Stands for ________
(a) Tentative Quality Management
(b) Total Quality Measurement
(c) Total Quality Management
(d) Total Quantity Measurement
Answer:

Option (c)

23.
As per BS: 7850, Part – I, 1992 TQM can be referred as ________
(a) Continuous Quality Improvement
(b) Total Business Management
(c) Cost Effective Quality Management
(d) All of the above
Answer:

Option (d)

24.
Which of these is not a principle of TQM?
(a) Customer orientation
(b) Time management
(c) Leadership commitment
(d) Team Work
Answer:

Option (b)

25.
Which of these is not a part of building block of TQM Model?
(a) Substructure
(b) Foundation
(c) Pillars
(d) The top
Answer:

Option (a)

26.
Which of these is not a cost of quality control?
(a) Prevention Costs
(b) Indirect Cost
(c) External Cost
(d) Appraisal Cost
Answer:

Option (b)

27.
ISO 9000 series is a guideline for ________
(a) To design business strategy
(b) For marketing of business
(c) To adopt good business practice
(d) To help generating business idea
Answer:

Option (c)

28.
Which part of ISO 9000 series consist guidelines for quality assurance in production, installation and servicing?
(a) ISO 9001
(b) ISO 9002
(c) ISO 9003
(d) ISO 9004
Answer:

Option (b)

29.
Which part of ISO 9000 series consist guidelines for quality assurance in final inspection and test?
(a) ISO 9001
(b) ISO 9002
(c) ISO 9003
(d) ISO 9004
Answer:

Option (c)

30.
Which part of ISO 9000 series consist guidelines for quality assurance in design development and production?
(a) ISO 9001
(b) ISO 9002
(c) ISO 9003
(d) ISO 9004
Answer:

Option (a)

Showing 21 to 30 out of 33 Questions