101.
Cut and then paste the approach of LOM suitable for Laminated Tooling.
(a) True
(b) False
Answer:

Option (a)

102.
The only drawback of paste and then cut approach in LOM is the time-consuming decubing operation.
(a) True
(b) False
Answer:

Option (a)

103.
No protective environment is required in Laminated Object Manufacturing (LOM).
(a) True
(b) False
Answer:

Option (a)

104.
Selective laser Sintering (SLS) is developed by ______.
(a) Chalmers University of Technology
(b) Optomec Inc.
(c) Arcam AB, Sweden
(d) University of Texas, Austin
Answer:

Option (d)

105.
Which of the following is the last step of the rapid prototyping process?
(a) 3D Modeling
(b) Data Conversion
(c) Building
(d) Postprocessing
Answer:

Option (d)

106.
Which of the following is the first step of the rapid prototyping process?
(a) 3D Modeling
(b) Data Conversion
(c) Building
(d) Postprocessing
Answer:

Option (a)

107.
Which of the following is latest technology?
(a) Manual Prototyping
(b) Virtual Prototyping
(c) Soft Prototyping
(d) Rapid Prototyping
Answer:

Option (d)

108.

Which of the following can cause accuracy problems in SLA Processes?

(a)

CAD/CAM induced error

(b)

Laser beam width induced error

(c)

Material shrinkage error

(d)

All of the mentioned

Answer:

Option (d)

109.

In STL files, a large number of facets can cause

(a)

errors reduction

(b)

giant data file

(c)

longer part build time

(d)

all of the mentioned

Answer:

Option (d)