Quality Engineering (2181920) MCQs

MCQs of Designing for Quality

Showing 31 to 40 out of 45 Questions
31.

Which of the following is an incorrect statement related to the QFD process?

(a)

A better understanding of design interactions

(b)

Breaks down the barrier between functions and departments

(c)

Better documentation of the design and development process

(d)

Maximizes the number of engineering changes

Answer:

Option (d)

32.

Which of the following is not a tangible benefit of the QFD process?

(a)

Reduction in start-up and engineering cost

(b)

Increase in overall costs

(c)

Reduction in development time

(d)

Early identification of high-risk areas

Answer:

Option (b)

33.

The use of the QFD process leads to _____ efficient allocation of resources.

(a)

Less

(b)

Very less

(c)

More

(d)

Equally

Answer:

Option (c)

34.

Which of the following is not an intangible benefit of the QFD process?

(a)

Increase in development time

(b)

Improvement in customer satisfaction

(c)

Strengthens customer-company relationship

(d)

Facilitating multidisciplinary teamwork

Answer:

Option (a)

35.

Which of the following task is not performed during the ‘production planning’ phase of the QFD process?

(a)

Developing prototype

(b)

Studying technical descriptors

(c)

Launching the final product

(d)

Tabulation of operating instructions from the process requirements

Answer:

Option (b)

36.

Which of the following is not a phase involved in product development in the QFD process?

(a)

Product planning

(b)

Statistical planning

(c)

Process planning

(d)

Production planning

Answer:

Option (b)

37.

What does FMEA stand for?

(a)

Failure Modes and Effects Analysis

(b)

Failure Modes and Effective Analysis

(c)

Failure Modes and Efficiency Analysis

(d)

Failure Modes and Efficient Analysis

Answer:

Option (a)

38.

What is RPN?

(a)

Risk Potential Number

(b)

Risk Priority Number

(c)

Risk Preference Number

(d)

Risk Preventive Number

Answer:

Option (b)

39.

Find the odd one out related to the FMEA team.

(a)

Assembly engineer

(b)

Manufacturing engineer

(c)

Process variability data

(d)

Customers

Answer:

Option (c)

40.

Which of the following is not a benefit of FMEA?

(a)

Increase in customer satisfaction

(b)

Prioritize product/process deficiencies

(c)

Maximize late changes and associated cost

(d)

Document and track actions taken to reduce risk

Answer:

Option (c)